The E10-Feeder relay is designed specifically for power capacitor bank protection and control; it is a member of the DTIVA product type in the EuroProt+ product family.
The DTIVA products are configured to protect, control and supervise elements of the utility and industrial distribution systems, including radial, looped and meshed distribution networks. Because of the modular architecture, the modules are assembled and configured according to the user’s requirements; from that point on, the software determines the functions.
The EuroCAP configuration tool, which is available free of charge, offers a user-friendly and flexible application for protection, control and measurement functions to ensure that the IED-EP+ devices are fully customisable.
The E10-Feeder device has been designed to protect, control and supervise shunt capacitor banks.
The IED offers current-based protection functions, which include three-phase time overcurrent and residual time overcurrent protection.
The E10-Feeder also offers breaker failure protection.
Apart from the standard current-based protections, the E10-Feeder relay comes with protection functions specifically designed to protect capacitor banks: capacitor overvoltage protection, capacitor unbalance protection. The device is able to handle and protect different bank arrangements, such as ungrounded single star connection, double star (ungrounded) connection, delta-connected banks, “H” configuration, etc.. The E10-Feeder also offers breaker failure protection.
Voltage measurement is optional in the relay, which includes phase and residual overvoltage protection functions.
The E10-Feeder configuration measures three phase currents, the residual current and, optionally, three phase voltages and the residual voltage. The realized and optional current- and voltage-based protection functions are listed below.

| Protection & control functions | IEC | ANSI | *Inst. | |||
|---|---|---|---|---|---|---|
| Definite time undervoltage protection function | U<, U<< | 27 | 2 op. | 2024.12.19. | download | |
| Loss-of-load (undercurrent) protection function | I< | 37 | 1 | 2025.08.20. | download | |
| Three-phase time overcurrent protection function | I>, I>> | 51 | 2 | 2025.04.04. | download | |
| Residual overcurrent protection function | Io>, Io>> | 51N/51G | 2 | 2025.04.04. | download | |
| Definite time overvoltage protection function | U>, U>> | 59 | 2 op. | 2024.12.19. | download | |
| Residual definite time overvoltage protection function | Uo>, Uo>> | 59N | 2 op. | 2024.12.20. | download | |
| Voltage transformer supervision and dead line detection function | 60 | 1 op. | 2019.07.09. | download | ||
| Current unbalance function (CT Supervision) | 60 | 1 | 2024.12.20. | download | ||
| Capacitor unbalance protection for blocks in bridge connection function | ? | 51NC | 1 | 2024.07.31. | download | |
| Capacitor unbalance protection for blocks in double star connection function | 51NC | 1 | 2024.07.31. | download | ||
| Capacitor unbalance protection for blocks in double star connection (Version ”U”) function | 59NC | 1 op. | 2024.07.31. | download | ||
| Capacitor unbalance protection for blocks in double delta connection | 51NC | 1 | 2024.07.31. | download | ||
| Capacitor overvoltage protection function | ? | 59C | 1 | 2024.07.31. | download |
| IEC61850 documents | |||
|---|---|---|---|
| TISSUEs Implementation Conformance Statement (TICS) for the IEC 61850 Edition 2 server interface in Europrot+ product family | 18/04/2023 | download | |
| Protocol Implementation eXtra Information for Testing (PIXIT) for the IEC 61850 Edition 2 server interface in Europrot+ product family | 18/04/2023 | download | |
| Protocol Implementation Conformance Statement (PICS) for the IEC 61850 Edition 2 server interface in Europrot+ product family | 18/04/2023 | download | |
| Model Implementation Conformance Statement (MICS) for the IEC 61850 Edition 2 server interface in DTIVA product | 18/04/2023 | download | |
| Protocol Implementation eXtra Information for Testing (PIXIT) for the IEC 61850 Edition 1 server interface in Europrot+ product family | 20/03/2017 | download | |
| Protocol Implementation Conformance Statement (PICS) for the IEC 61850 Edition 1 server interface in Eurorot+ product family | 20/03/2017 | download | |
| Model Implementation Conformance Statement (MICS) for the IEC 61850 Edition 1 server interface in the Eurorot+ product family | 21/05/2012 | download | |
| Type description | |||
| Distributed network components protection & control | 18/07/2025 | download | |
| Hardware Guides | |||
| Hardware description | 05/05/2025 | download | |
| Maintenance guide | 28/06/2023 | download | |
| Application Guides | |||
| Operating Manual and Troubleshooting Guide - system version: 2.8 | 19/09/2023 | download | |
| Configuration Descriptions | |||
| E10-Feeder configuration description | 20/02/2014 | download | |
| E10-Feeder_H product configuration options | 22/10/2025 | download |