In December 2012, in the context of the service life extension of the plant., MVM Paks Nuclear Power Plant Co. issued an invitation to tender for the upgrade of the protection and control system of the 6 kV distributors for normal operation (ABOS4) and for the backup system (ABOS2).
In December 2012, in the context of the service life extension of the plant., MVM Paks Nuclear Power Plant Co. issued an invitation to tender for the upgrade of the protection and control system of the 6 kV distributors for normal operation (ABOS4) and for the backup system (ABOS2).
In December 2012, in the context of the service life extension of the plant., MVM Paks Nuclear Power Plant Co. issued an invitation to tender for the upgrade of the protection and control system of the 6 kV distributors for normal operation (ABOS4) and for the backup system (ABOS2).
In December 2012, in the context of the service life extension of the plant., MVM Paks Nuclear Power Plant Co. issued an invitation to tender for the upgrade of the protection and control system of the 6 kV distributors for normal operation (ABOS4) and for the backup system (ABOS2).
Protecta Ltd. was selected, from a group of international bidders, to deliver the complete protection system. In this project, in line with the annual maintenance schedule of the blocks, a total of 576 EuroProt+ devices will be delivered until mid-2018. Protecta Ltd. is responsible for the development, production and configuration work required for the commissioning of the whole system.
The project value exceeds HUF 350 million.